Bennington project list, week of May 23

Posted

Highway Department

Monday

• A crew will be grading Westside Drive in preparation for blacktop. This Street will be closed to through traffic.

• A crew will be rebuilding catch basins on Eastside Drive, this street will be closed to through traffic.

• A private contractor will be finishing paving on Morgan Street, please use alternate roads if possible.

Tuesday

• A crew will be grading Eastside Drive in preparation for blacktop. This street will be closed to through traffic.

• A crew will be paving Westside Drive, this street will be closed to through traffic.

• Wednesday

• A crew will be paving Eastside Drive, this street will be closed to all through traffic

Monday –Friday

• A crew will be rebuilding sewer man holes and preparing Oakes Street for paving possibly by the end of the week, lane restrictions and one way traffic will be in place.

• Crews will be working on Frost Drive rebuilding structures and grading to prepare for blacktop.


TALK TO US

If you'd like to leave a comment (or a tip or a question) about this story with the editors, please email us. We also welcome letters to the editor for publication; you can do that by filling out our letters form and submitting it to the newsroom.

Powered by Creative Circle Media Solutions