BOSTON (AP) -- The Cape Wind offshore wind project is set to begin an extensive survey of the area in Nantucket Sound where they plan to build a 130-turbine wind farm.
The survey begins Friday and continues through early fall. The first step involves acoustic imaging to map the seafloor. Then, sampling will be done ensure no Native American artifacts will be disturbed and to analyze the soil, followed by deeper soil borings.
Cape Wind hopes to begin construction next year and produce power in 2015.
Critic Audra Parker of the Alliance to Protect Nantucket Sound said Cape Wind faces major obstacles before construction, including four federal lawsuits.
She also noted three lawmakers have called for a federal probe after documents obtained by her group indicated the Federal Aviation Administration felt political pressure to approve Cape Wind.


Join The Conversation
Welcome to your discussion forum:
Verified accounts are now required for immediate posting. Please verify your e-mail address in Disqus, or sign in with your social networking account. You may also post using your e-mail address (which will remain private), but those posts will first need to be approved by the moderator. Comments made here are the sole responsibility of the person posting them; these comments do not reflect the opinion or approval of the Bennington Banner. This forum encourages open, honest, respectful and insightful discussions; there is no need to be offensive. Read our guidelines.